Scheduling a Work Order

How to: Schedule a work order.

Environment: Comsense Enterprise

In this article:

Accessing Shop Scheduling

Enterprise > Shop Management > Shop Scheduling

Click image to enlarge
Enterprise Navigation menu; shows the location of Shop Management and Shop Scheduling.
Image 1: Enterprise Left-Hand Navigation Menu

Scheduling the Work Order

In the Shop Name field:

  1. Click the Down Arrow
  2. Select the appropriate shop
    • The Unscheduled Work Order pane will populate
Click image to enlarge
Shop Scheduling window; shows the location of the Shop Name down arrow and the Shop Name drop-down list.
Image 2: Shop Name Drop-Down List

On the unscheduled work order line item:

  1. Click & Hold the Right Arrow
Click image to enlarge
Shop Scheduling window, Unscheduled Work Order pane; shows the location of right right arrow.
Image 3: Work Order Right Arrow
  1. Drag the work order to the Schedule pane
    • The cursor will become a No symbol as you drag the work order to the schedule pane
Click image to enlarge
Shop Scheduling window; shows the No symbol cursor.
Image 4: No Symbol Cursor
  1. Drop the work order under the appropriate person and time
Click image to enlarge
Shop Schedule window, Schedule pane; shows the scheduled work order.
Image 5: Scheduled Work Order
  1. Click Save & Close

Rescheduling the Work Order

If you did not schedule the work order for the correct person or time, Drag & Drop the activity to the correct location on the schedule.

Click image to enlarge
Shop Schedule window, Schedule pane; shows the scheduled work order scheduled for a different person in a different time slot.
Image 6: Rescheduled Work Order

For information on removing a work order from the shop schedule, see Removing a Work Order from the Shop Schedule.