Purpose: Update the Building Area or Phase in a project through a change order.
Environment: Comsense Advantage (ver. 24.4.100.31 or later)
How it Works:
You can update the Building Area or Project Phase in the Master Schedule grid of a project.
Complete the following steps for making the desired changes:
-
Ensure that the Automatic Section Break (ASB) is enabled for your project.
NOTE
In a change order when Automatic Section Break (ASB) is enabled: In a change order when ASB is not enabled: - If the given building area is an ASB criterion, the opening building area can only be changed when the original opening quantity is 0.
- If the given phase is an ASB criterion, the opening phase can only be changed when the original opening quantity is 0.
- The opening building area can be changed.
- The opening phase can be changed.
-
Create an internal change order for the project, and set the opening quantity to 0.
- Sell the change order. Refer to the article Selling a change order to know how to sell a change order.
- Now create a new internal change order and set the opening quantity back to the previous value.
- Based on your requirements, specify the new Building Area or Project Phase in the Master Schedule grid.
NOTE: The new Building Area or Project Phase appears in section names while viewing the components in the Pricing window. - Sell the change order.